Collins Content-Engine Onboarding Packet 2026-06-30

Local prep packet for Collins Adam Durado. No external messages, invites, credentials, deploys, workflow edits, or publishing happened while creating this.
↻ UPDATED — 2026-07-13 · offer accepted · read the current docs first Collins accepted on the Jul 13 call; start Jul 14, part-time ~20 hrs/wk. The role is the daily production machine + automated sales, first build = automated client onboarding. Daily rhythm: 1–2 PM live meeting · 2–4 PM his build time · 4 PM EOD report in Slack #daily-reports. Read these first: Builder Vision Handoff · Start Plan (6-week map) · Daily Operating Rhythm (daily meeting, Slack, scoreboard, EOD + logoff) · Akash Runbook. The 06-30 content-operator files below are kept for reference; where they conflict, the 07-13 docs win.

Objective

Prepare Collins to independently run the St. Pierre content engine.

Why it matters

Akash should stay on recording, taste gate, and sales - not daily project management.

You need to

Review the held approvals before sending or granting access. ~8 min.

Status

Prep packet built locally. Live control is held until week-1 proof.

Start here needs you
★ Default: send Collins the candidate-facing handoff only after Akash approves the exact wording and access list.
Packet files no action
FileUse it for
README.md — Codespace + Claude Code self-start currentCollins's exact GitHub Codespace, Claude sign-in, connector, Composio, safety-check, and definition-of-done steps.
builder-vision-handoff-2026-07-13.html currentThe two pipelines + all 7 systems, end-state vs today. Canon vision doc.
collins-start-plan-2026-07-13.html currentCollins' current 6-week map (supersedes the old Gantt/single-clip week-1).
daily-operating-rhythm-2026-07-13.html currentHow every day runs: the 1 PM daily meeting, Slack channels, the live scoreboard + metrics Collins owns, the 4 PM EOD report, logoff hygiene.
akash-onboarding-runbook-2026-07-13.html currentAkash's side: the terms-confirmation send, access grants (invite/seat), and the kickoff decision table.
start-here.htmlCollins' plain-English onboarding home: mission, rules, sources, week-1 outcome.
tech-stack-map.htmlFull stack map with live/test/held status and what each layer does.
tech-stack-map.csvImportable stack table for Sheets or a tracker.
access-tracker.csvEvery access lane, permission level, owner, approval status, and removal steps.
video-intake-addendum.htmlNew context: recording packet, raw drop, manifest, rough cut, contact sheet, and first-week intake proof.
week-1-mission-ticket.htmlThe first proof task: raw talking-head clip to approved publish pack.
week-1-input-output-tracker.csvStatus tracker for every week-1 input and output.
kickoff-agenda.html20-minute onboarding call agenda and screen-share script.
daily-update-template.txtCopy/paste daily update format for Collins.
offer-email-draft.html currentTerms-confirmation + access email (offer accepted Jul 13). Recaps terms, the 1–2/2–4/4 PM rhythm, and asks for his Gmail, GitHub, hours/timezone, 24-hour plan.
candidate-handoff-draft.htmlGmail-ready draft, held until Akash approves sending.
approval-checklist.htmlHuman approval list before any sends, invites, live permissions, or publishing.
approval-checklist.csvImportable approval tracker.
Held approvals held work
Any future external write or account permission change needs Activity Ledger before or at the change, with rollback steps and verification.
Source-of-truth files used reference only
Path: Projects/St_Pierre_Digital/Recruiting/Collins-Onboarding/index.html